Fixture counts, rough-in and test records, and inspection stages that don't live on the back of a permit card. $59, once.
Not a generic service form with a notes box at the bottom. The fields are the ones that matter on this job, and the document at the end is the one your customer expects.
Scope, permit, and the inspection stages your inspector actually asks for — named the way your county names them.
Fixtures, materials, pipe sizes and runs. Photographed before it's covered, which is the only time it can be.
Pressure or air test, held at what, for how long, witnessed by whom. Numbers, not adjectives.
Final inspection result, findings cleared, record printed with your licence.
Job and permit reference · fixtures counted by type · materials and pipe sizes · rough-in photos · test type, pressure, duration and result · inspection stages with results · findings · licence number · customer signature.
It counts fixtures; it does not size anything to code. DFU sizing is your judgement and your jurisdiction's table — Sterling records what you installed.
Do the whole job offline — photos and all — and it syncs itself when you're back in range.
There's a button inside every work layer that sends me a message. I read all of them myself. When a fix ships because someone told me, it goes in the changelog with a thank-you.